The project consists of concrete pavement removal, shoulder scraping, full-depth roadway reclamation, stabilization for base course, 1.5″ 12.5mm asphalt paving, 3″ 19mm asphalt paving, concrete driveway/sidewalk remove/replace, striping, shoulder backing, grassing, and traffic control.