The project consists of grading, demolition, granite roadway base, rock drive, asphalt paving, discharge, gravity sewer, drainage pipe and structures, electrical and controls, erosion control and grassing, complete influent pump station, complete headworks and dump truck station, complete inline pump station, complete SBR system-based treatment plant, complete disk filtration system, complete UV disinfection, complete reject pump station, complete underdrain pump station, complete reclaimed water pump station, complete sludge dewatering system, emergency power supply, transformer, and laboratory casework.