The project consists of paved concrete apron removal, 8″ granular roadway base, various concrete and asphalt paving, bituminous prime and tack coat, pavement striping, sidewalk installation, drain inlet structures, HDPE pipe, 10″ gravity sewer installation, 2″ waterline installation, 7′ fencing, site demolition, clearing, grubbing, grading, and erosion control.